Quick answer
To compare Permits results, keep input, format and settings fixed and change one variable. Electrical/structure/fence may need permits.
Why it matters
Changing several variables at once makes results unattributable.
Electrical.
Step by step
- Check type/size/electrical/pad/delivery/location.
- Separate equipment/delivery/electrical/pad/cover/chemicals.
- Get 2-3 quotes; confirm model/electrical/warranty.
- Contract states scope/delivery/payment/warranty.
Common mistakes
- Equipment price only, not electrical/pad.
- Ignoring delivery/access/crane.
- Not checking cover/chemicals/warranty.
- No payment/delivery terms.
Checklist
- Type/size/electrical/pad/delivery.
- Equipment/delivery/electrical/cover/chemicals.
- Location/access/safety/permits.
- Warranty/payment/contract.
- Budget/maintenance/power.
Key facts
- Electrical.
- Structure.
- Fence.
FAQ
How do I compare two Permits results?
To compare Permits results, keep input, format and settings fixed and change one variable. Electrical/structure/fence may need permits.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Energy.gov